Upper Providence Township New Emergency Service Facility
Owner: Upper Providence Township Project Name: New Emergency Services Facility Project Number: 720001 Owner: Upper Providence Township Project Name: New Emergency Services Facility Project Number: 720001 Building Milestones P1.1-P1.2 - Notice to Proceed, Shop Drawings, Submittals Overall Project Schedule Status Overall Project Schedule Status
202
J
F M A M J
2021
P1.12-P1.17 - Building Pad, Foundations, Structural Steel, Slab on Grade P1.18-P1.19 - Exterior Masonry walls, Waterproofing, Roof structure P1.20-P1.24 - Interior Partitions, MEP system placement P1.25-P1.33 - Paint walls, Install Ceiling grids, Finishes, Casework, Flooring, Install Fire and Security Alarms, MEP Commissioning P1.34-P1.36 - Final Inspections and Cleaning, Building Punchlist prep, Contractor correction period P1.37 - P1.40 - Owner Building Systems Training, Final Completion for New Building, Owner FFE and Move-in Site Milestones P1.3-P1.11 - Temporary E&S, Install Staging, Construction Entrance and Fence, New Utilities installation P1.41 - Installation of Site Lighting Bases and Lights P1.42 - Curbing and Stone base for Parking Lots and Sidewalk installation P1.43-P1.44 - Installation of Sidewalks, Aprons and Site Concrete, Grading and Landscaping Building Milestones P1.1‐P1.2 ‐ Notice to Proceed, Shop Drawings, Submittals P1.12‐P1.17 ‐ Building Pad, Foundations, Structural Steel, Slab on Grade P1.18‐P1.19 ‐ Exterior Masonry walls, Waterproofing, Roof structure P1.20‐P1.24 ‐ Interior Partitions, MEP system placement P1.25‐P1.33 ‐ Paint walls, Install Ceiling grids, Finishes, Casework, Flooring, Install Fire and Security Alarms, MEP Commissioning P1.34‐P1.36 ‐ Final Inspections and Cleaning, Building Punchlist prep, Contractor correction period P1.37 ‐ P1.40 ‐ Owner Building Systems Training, Final Completion for New Building, Owner FFE and Move‐in Site Milestones 3‐P1.11 ‐ Tempor ry E&S, Install Staging, Construct on Entranc and Fence, New Utilities installation 1 ‐ Installation of Site Lighting Bases nd Lights 2 ‐ Curbing and Ston base for Parking Lots and Sidewalk installation 43‐ 44 ‐ Installation of Sidew lks, Aprons and Site Concrete, Grading and Landscaping P1.45-P1.46 - Final Grading and Site Signage, Paving P1.47-P1.48 - Demolish existing structure, Paving P1.54-P1.55 - Project Substantial and Final Completion P1.45‐P1.46 ‐ Final Grading and Site Signage, Paving P1.47‐P1.48 ‐ Demolish existing structure, Paving .54‐P1.55 ‐ Project Substantial and Final Completion P1.21-23, P1.33 - Complete Placement of MEP Systems, MEP Start-up P1.24 - Energize Permanent Power P1.25 - Complete Painting of Walls Current Phase and Schedule Status Current Phase and Schedule Status P1.28 - Plymovent System P1.31 - Install Floor Finishes P1.32 - Complete Fire Alarm & Security System P1.34 - Complete All Final Inspections P1.35 - Complete Final Cleaning P1.17 ‐ Erect Structural Steel P1.18 ‐ Complete Exterior Masonry Walls P1.19 ‐ Complete Roof ‐ Building to be Water Tight P1.20 ‐ Complete Interior Walls .21‐23 ‐ Complete Plac me t of MEP Systems P1.24 ‐ En rgize Permanent Power P1.25 ‐ Complete Painting f Walls P1.26 ‐ Install C iling Gri and Complet Hard Ceilings Contract General Contractor: Lobar, Inc. Mechanical Contractor: Tri-County Mechanical, Inc. Electrical Contractor: Electri-Tech, Inc. Plumbing Contractor: Vision Mechanical, Inc. Con act General Contractor: Lobar, Inc. Mechanical Contractor: Tri‐County Mechanical, Inc. Electrical Contractor: Electri‐Tech, Inc. Plumbing Contractor: Vision Mechanical, Inc. Issues Resolved Finalize direction to ETI on structural requirements of the concrete pad at generator. Coordinate the FF&E delivery process with GKO and the Township. GKO generated ASI to enclose Plymovent motor for Apparatus Bay noise reduction. Issues Resolved Work with Vision Mechanical on resolving sprinkler shop darwings and calculations. Coordinate with Lobar on roof nail board and stone veneer procurement. Coordinate the FF&E process with GKO and the Township. Complete building low voltage, security, and access control design with GKO and CEI.
J
F M A M J
J
J F M A M J
J F M A M J J
Contract Amount
$ $ $ $ $
10,719,597 7,462,000 1,123,000 1,212,400 1,212,400 922,197 1,123,000 7,462,000
$ $ $ $ $
Contract Amount
$ $ $ $ $
$ $ $ $ $
Total Total Soft Costs: Current Remaining Project Contingency Total Total Soft Costs: Current Remaining Project Contingency
922,197
10,719,597
Other Discussion:
Other Discussion