The Hill School
Project Experience and References - Penn State University
CONCEPT STUDIES COST ESTIMATING DESIGN / CONTRACTOR ENGAGEMENT CONSTRUCTION OVERSIGHT
Penn State Worthington
In 2013 D’Huy Engineering Inc. (DEI) was hired by Pen letic facilities campus at the Penn State, Worthington S local andmain campus officials to develop a plan to bes project resulted in turning a dilapidated baseball field new softball field was carved out of the adjacent ope netting system between fields, new dugouts, and a ce both fields were developed. A field house with conce just off the plaza behind home plate. A third soccer fi and a newwalkway.
CONCEPT PLAN:
D’Huy Engineering was retained by Penn State University for concept planning and ultimately design services for ath- letic improvements at two satellite campuses. Each concept plan was conceived through a collaborative process with multiple layers of university stakeholders. Each plan incor- porated the needs of competitive play, community activities and student recreational use. D’Huy’s attention to detail fo- cuses on total project cost and strategies for project delivery that were outlined in the concept plan provided the univer- sity with the confidence to retain D’Huy for the subsequent design and construction phase services.
COMPLETED PROJECT:
References
Kim Berry Chief Operating Officer PSU Berks 610-396-6030 Penn State Berks Campus:
Kurt Coduti Penn State University Facilities Project Manager 814-863-4960
Eugene Grogan Dir. of Business Services Penn State, Worthington Scranton 570-963-2514 Worthington / Scranton Campus:
Made with FlippingBook - Online magazine maker