Improvement to Southern Lehigh Field Complex

COSTARS PROPOSAL

31 10 00 - Site Clearing Division 31 - Earth Work

Remove Asphalt Pavement Remove Chain-Link Fence (4'H)

Remove Goal Post Remove Stone Path Remove Storm Pipe Remove Track Surfacing Remove Trench Drain (Track Perimeter)

31 20 00 - Earth Moving Import Soil Respread Topsoil

Site Cuts Site Fills

Site Grading Strip Topsoil Geotech Fabric #3 Stone Under Track Oval 31 25 00 - Erosion & Sedimentation Controls

12" Composite Filter Sock 18" Composite Filter Sock 4' Construction Fence Concrete Washout Erosion Control Matting Infiltration Bed Stone Inlet Protection Rock Construction Entrance (RCE)

Division 32 - Exterior Improvements

32 12 16 - Asphalt Paving

2A Modified Subbase (Under Asphalt) Asphalt Paving (Heavy-Duty) Asphalt Paving (Light-Duty)

32 13 13 - Site Concrete #5 Rebar #6 Rebar #7 Rebar

4,000 PSI Concrete (Air Entrained) 6x6-W2.9xW2.9 Column Footing

Concrete Pier Slab-on-Grade Allowance for 4 stadium light piers (excavate, rebar, concrete) Geotech Fabric Under Stone on Track #3 Stone on Track Oval

32 17 13 - Parking Bumpers 6" Wheel Stop 32 17 23 - Pavement Markings Handicap Parking Space 32 18 13 - Synthetic Turf Surfacing – Pricing will compare multiple turf manufacturers Synthetic Turf Field – 10 Year Warranty Mid Field Logo Endzone Lettering #8 Stone AASHTO #57 Subbase (Site)

Corporate Office 827 Lincoln Avenue Suite 15 West Chester, PA 19380 Tel: 610.626.1000 Fax: 610.626.3000

Virginia Office 5 715 South LaburnumAvenue Richmond, VA 23231 Tel: 804.405.4884 Fax: 610.626.3000 www.millersports.com

800.821.8611

Made with FlippingBook - Online Brochure Maker