Whitehall Municipal Campus Improvements
Whitehall Township
Whitehall Municipal Campus Improvements Whitehall Township
Construction Manager
WHITEHALL MUNICIPAL CAMPUS Whitehall Township
DEI Project No.719001 Monthly Progress Report No.15 August 2021
Work Completed
Phase 3: Existing Municipal Building Renovation, Completion of Police Addition Finishes
• Phase 3: Renovation of Existing Municipal Building, Construction of Alternate Elevator, Construction of Solar Canopy, Completion of Exterior Improvements, Final Finishes Police Addition • Start: April 2021 • Completion of Phase: December 2021 • Preparation of floors for flooring finishes • Installation of drywall and acoustical ceiling grid WORK COMPLETED - Existing Building Renovation Phase 3
• Integration of security, card access and overhead garage door systems • Architectural and MEP punch list items for the cell block, evidence processing area and second floor • Installation of wall and floor tile vestibule entrance, monumental stairs, and main lobby Police addition •Installation of wood handrails on monumental stairs • Final finishes for Police Addition elevator Police Addition Phase 2 WORK IN PROGRESS - Site •Maintaining Erosion and Sediment controls • Final grading, layout, and base paving of Police addition parking lot • Installation of curb and sidewalks
Main Entrance Tile Wall
Alternate Township Elevator
August 2021
Work In progress
Existing Building Renovation Phase 3
• Added Scope... • Demolition of existing municipal building toilet rooms • Layout and core drilling for new sanitary and water lines in toilet room area • Final overhead electrical finishes including lighting, speakers, and fire alarm • Final terminations and testing of technology in renovated areas • Installation of final overhead finishes for mechanical and fire protection system • Startup of newmechanical heating and cooling systems • Installation of interior aluminum door frames and windows • Installation of steel framing, roofing, and weatherproofing for new elevator addition • Scheduling of MEP and building inspections, ongoing • Coordination of Township move back to renovated space
Existing Municipal Toilet Room Demolition
Monumental Stairs
Police Secure Parking Area Area
Development Office
August 2021
Renders
August 2021
Site Plan
August 2021
Floor Plan
First Floor Plan
Second Floor Plan
August 2021
Whitehall Township Project Name: Municipal Campus Improvements Project Number: 719001
2020
Overall Project Schedule Status
J-F
M-A M
J-F M-A M-J J-A S-O N-D
Construct New Public Works Facility Construct Police Addition Phase 1 ‐ Foundations & Building Pad Construct Police Addition Phase 2 ‐ Complete Addition Except Finishes Demolition of Existing Garage Buildings Renovate Existing Municipal Building Phase 3 Police Addition Phase 2 ‐ Final Finishes Site Work Substantial Completion / Final Completion
Contract Phases M-A M J-F
Current Phase and Schedule Status
J-F M-A M-J J-A S-O N-D
Renovate Existing Municipal Building Phase 3 ‐ Elevator Construction
‐ Exterior wall panels/Brick ‐ Gypsum Board Installation ‐ MEP Ceiling Rough ‐ in ‐ Interior Finishes Added Scope ‐ Demolition Site Work
Issues Resolved
Contractor COVID ‐ 19 Protocols provided and implemented onsite
Additional existing material environmental testing
Township added scope request
Existing Township Building Concrete Slab Vapor Barrier Confirmation
Paid to Date
Contract General Contractor: Skepton Construction, Inc. Mechanical Contractor: JBM Mechanical, Inc. Electrical Contractor: Boro Construction Plumbing Contractor: JBM Mechanical, Inc. Environmental Contractor: [Prism Response, LLC]
Contract Amount
$ $ $ $ $ $ $ $
9,680,000 1,081,000 1,779,500 1,139,000 13,771,429 3,958,464 91,929
$ $ $ $ $ $
Total Total Soft Costs: Current Remaining Project Contingency
908,850
Report Submission Date:
August 2021
Report Author:
Kim LaBrake
2021
2022
Status Comments
M-J J-A
S-O N-D
J-F M-A M-J
J-A S-O N-D
% Complete
100% 100% 100% 100%
Each scheduled task extended 6 weeks
Includes Abatement and Additional Scope work
80%
0%
85% 0%
s FP1 & B1 2020 ‐ 2021
Status Comments
M-J J-A
S-O N-D
J-F M-A M-J
J-A S-O N-D
% Complete
80% 70%
100% 100% 75%
35% 75%
Interior Painting, floor and MEP finishes
100%
Material orders & Demolition
75%
Issues in Progress
Doors and hardware delivery Finalize Township Move ‐ In date
Executed Change Orders
Original Material Allowance
Remaining Material Allowance 71,338 $ 8,792 $ 33,791 $ 29,511 $ ‐ $ 143,431 $
e (with 5% retained)
$ $ $ $ $ $
698,435 1,143 81,635 169,155 22,041 424,462
$ $ $ $ $ $
278,405 17,375 6,000 61,380 28,800 164,850
1,059,922 1,537,725 1,019,257 8,472,218
93,072
12,182,194
Printed 9/10/2021 1 of 1
Integration Team Michael Harakal, Mayor John (Jack) Meyers, Deputy Mayor Michael Marks, Chief of Police Tim Christman, Building & Grounds Lee Rackus, Chief of Development Board of Commissioners Philip Ginder, President Joesph Marx, Jr., Vice President
Thomas Slonaker, Secretary Jeffrey J. Warren, Member Charles G. Fisher, Member Randy Atiyeh, Member Michael Dee, Member
Design & Construction Team KCBA Architects, Architect / Structural Engineer Snyder Hoffman, MEP Engineer Terraform Engineering, LLC, Site / Civil Engineer D’Huy Engineering, Inc., Construction Manager Skepton Construction, Inc., General Contractor JBMMechanical, Inc., HVAC Contractor JBMMechanical, Inc., Plumbing Contractor Boro Construction, Electrical Contractor
Made with FlippingBook Learn more on our blog