Upper Providence Township
Report Submission Date: January 2022
Report Author: Michael DePodwin Report Submission Date: November 2021
21
2022
J
A S O N
D J
F M A M J
% Complete
Status Comments
Report Author: Michael DePodwin
Complete
100% 95% 99% 100% 99%
1
2022
Complete Final roof metal outstanding Complete except for MDP installation. Ceiling grid complete, casework and floor finishes ongoing Status Comments Slab on G ade and S ru tural Steel complete. Exterior walls complete. Roof weathertight. Interior block wall complete. MEP rough‐in ongoing Interior block filler ongoing. Resubmittals nearing completion Status Comments All light pole bases installed. Light pole installation ongoing Complete Stabilization of site complete Base and binder paving courses complete. Complete Complete Concrete apron installation complete Base and binder paving courses complete. Fence to be completed Complete
A S O N
D J
F M A M J
% Complete
10 9 9
80% 0% 0%
100% 100% 100% 10% 0% 0%
50% 65%
99%
0% 0% 90% 100% 25%
Phase 1 2021
60%
J A S O N D J F M A M J
% Complete
75% 95% 99% 0% 0%
Block filler and first coat complete. Complete except for MDP installation. Waiting on MDP delivery.
Phase 1 2021
Status Comments
A S O N D J F M A M J
% Complete
100% Complete
15% To be completed after apparatus bay flooirng 75% 75% Casework nearing completion 25% Ceiling tile edge installation ongoing. Device installation ongoing. 80% 100% 100% Complete Complete 100%
Roof weathertight. Metal roof and cap sheet outstanding. Complete All system installation ongoing.
95% Nearing completion 80% 10% Block filler underway
Issues in Progress
Expedite the installation of PECO gas line and delivery of MDP to have permanent power on site. GKO generating ASI to enclosure the Plymovent motor for Apparatus Bay noise reduction. Finalize direction to ETI on structural requirements of the concrete pad at generator. Continue Coordinate ASI 11 work with ETI, ETI's controls subcontractor, and UPT's security vendor. 0% Issues in Pr gress Review cost proposal from ETI regarding low voltage, security, and access control changes. Continue to monitor Erosion & Sedimentation Controls and respond to MCCD inspect on report. Ensure site hours, noise, and lighting are complia t with Township ordinances. Continue to track equipment and material procurement to ensure critical path remain on schedule. Executed Change Orders Original Material Allowance
Paid to Date (with 10% retained)
Remaining Material Allowance
$ $ $ $ $
179,623 47,807 98,883 64,622 390,934 184,489 47,807 98,883 64,622 395,800
$ $ $ $ $
6,231,360
$ $ $ $ $
- -
$ $ $ $ $
209,365 47,807 94,098 37,920 209,365 389,190 47,807 94,098 37,920 389,190
818,358
Paid to Date (with 10% retained)
Original Material Allowance
8,884,107 4,81 ,025 482,268 1,096,570 737,819
147,752
Remaining Material Allowance
Executed Change Orders
-
$ $ $ $ $
147,752 ‐
$ $ $ $ $
$ $ $ $ $
‐ ‐ ‐
533,674 476,034
6,310,001
‐
0% Submittals
98% Requests for Information Requests for Information 0%
0%
Approved Rejected Voided Overdue Approved Rejected Voided Overdue
0%
12%
Complete Outstanding Voided Overdue Complete Outstanding Voided Overdue
88% 0% Submittals
2%
0%
0%
13%
0%
2%
87%
98%
Printed 2/7/2022