The Hill School
Animated publication
October 26, 2021
The Hill School 860 Beech Street Pottstown, PA 19464
Dear Mr. Bouher,
We appreciate the opportunity and the time you took to show us the proposed project and features.
With offices inBethlehemandAmbler, PA, D’Huy Engineering, Inc. (DEI) has excelled at completing Pennsylvania stadium projects on time and on budget for more than 40 years. We have designed and managed over $500M in projects in the past 4 years with 80% of our work dedicated to PA school district projects. We are Facilities Engineers and specialize in completing new and renovation projects, athletic facilities, maintenance and replacement work, campus planning, energy studies, and building envelope repairs. Our client-driven approach provides exceptional people to seek the best solutions with you and deliver remarkable project results to you.
In 2020-2021 we are working on several athletic complexes for which we have provided concept planning, cost estimating, design, procurement, and construction oversight including
• Council Rock School District- 2 Stadium Projects • Salisbury School District - Turf Replacement • East Penn School District - High School Stadium
• Catasauqua School District - High School Stadium and Field House • Easton Area School District - District Stadium and Field House • Hatboro-Horsham School District– Newmulti-sport synthetic turf and bleachers
DEI’s combination of technical expertise and practical experience will provide a seasoned team of personnel that are trained to manage and guide the conceptual planning and cost estimating. Equally important is the leadership, innovation, and attention to detail to deliver an exceptional project for The Hill School and a template for the success of future work. This detail and focus on complete documentationwill result in reduced liability, project savings, and quality throughout the project. We are confident that we can assist you and look forward to further discussing that possibility with you and your stakeholders. We will treat your project as if it was our own home and tirelessly seek to reduce risk and pursue excellent results and savings for The Hill School community.
Thank you for your time and consideration.
Sincerely, D’HUY ENGINEERING, INC
James P. Lynch, CCM, AVS
M. Arif Fazil, PE, LEED AP, CEM, CCS, CCCA
Principal
President
One East Broad Street, Suite 310, Bethlehem, PA 18018 | 31 East Butler Avenue, Ambler, PA 19002 | 1500 W 7th Street, Wilmington, DE 19805
Who We Are
Who We Are
D’Huy Engineering, Inc. Headquarters: One East Broad Street, Suite 310 Bethlehem, PA 18018
Professional Disciplines 19 Licensed Engineers 3 Licensed Architects 5 LEED Accredited Professional 2 Certified Energy Managers 2 ICC Certified Inspectors 2 Certified Professional Estimator 1 Certified Construction Manager 3 Certified Construction Specifiers 5 Cert. Construction Contract Admin
Small / Diverse Status: PA Department of General Services
Small / Diverse Business #337252202108-SDB-M NMSDC Minority Business Cert. NO. PT02100
Philadelphia Regional Office: 31 E Butler Ave Ambler, PA 19002 Delaware Regional Office: 1500 W 7th Street Wilmington, DE 19805
Point OF Contact: President: James P. Lynch, CCM, AVS Cell Phone: 484.357.8969 jpl@dhuy.com
Staff at Your Service: 57 30 Senior Project & Site Managers
17 Technical Specialists 1 Education Specialist 9 Administrative Support
We Offer Complet
Coordinates civil design and submission for NPDES permitting
Laser-focus on establishing Milton Hershey goals and Owner priorities
a
STUDY
DESIGN
Lock down project scope and budget with Architect, Civil Engineer
Comprehensive turf system knowledge
Provide eff procuremen
Northampton Area School District – Stadium, Turf & Track
D’Huy Engineering, Inc. has been partnering with Northampton Area School District (NASD) for more than 16 years. In 2016, we completed the new Northampton Middle School. DEI served as the Construction Manager for this $56M middle school project, including supervising the details of how a three story building will fit into a tight campus hillside and wrap around the existing Northampton Stadium. Through extensive phasing and project management, DEI led NASD through the process of upgrading the stadium to accommodate a new synthetic turf surface, track and stadium lighting. DEI continued to consult with the architect and developed a second synthetic turf multi-sport field for the District. As the District continues to improve its facilities, we are proud to work closely with them to provide campus master planning and retainer services. Our most recent project with NASD was a new 86,970 square foot Lehigh Elementary School, completed Summer 2021.
By the Numbers
Project Team
Million $ of Construction Managed in the Past 4 years
James “Jamie” Lynch CCM, AVS Senior Project Manager
Richard Babyak, AIA Athletic Field Designer
PA Education Clients
Licensed Professional Engineers & Architects
Employee Time Lost for Injuries Incurred on Job Site
Kimberly LaBrake, AIA Building Systems & Code Review Specialist
James (Jim) Hanna, CPE, CCCA, CCS Cost Estimating Specialist
Change Orders in Past 10 years on Total Construction Value of $850M
te Project Services
Comprehensive pre-construction conference to set ground rules and propel the project forward with confidence
Infiltration, compaction and G-max testing oversight
Rigorous coordination of addenda and tracking of contractor engagement
PROCURE
CONSTRUCTION
Celebrating Project Success!
fective bid strategies and nt options to maximize quality
Consistent, thorough and meaningful project reporting throughout the entire construction phase
About Us
“We value our long term relationship with D’Huy. Their leadership, attention to detail, and team approach has produced an excellent level of quality that has resulted in consistent project success over the past 19 years. For the 2015-2016 school year, the District constructed an $80.7 million middle school and secondary campus improvements. D’Huy and the District have collaborated throughout the design and construction phases of this project with much success.”
• Founded in 1976, providing over 40 years of design engineering and capital project management. • Service offerings Athletic Facility Design: Project / Construction Management, Facility Engineering Structural Design and Infrastructure. • Regional firmwith ongoing projects throughout PA as well as NY, NJ and DE. Specialize in multi-prime, public construction projects. • Multi-disciplined staff of engineers, construction managers, architects and facilities professionals. • Guided by out core values of integrity, excellence, teamwork, passion and leadership.
Joseph Kovalchik Superintendent Northampton Area School District
Project Experience and References - Bethlehem Area School Di
Bethlehem Area School District Stadium
CONCEPT STUDIES COST ESTIMATING DESIGN / CONTRACTOR ENGAGEMENT CONSTRUCTION OVERSIGHT
D’Huy Engineering worked closely with the District to plan and coordinate the replacement of this high demand, high profile stadium synthetic turf field. The new state-of-the-art turf was installed during the Summer of 2016 under the direction of D’Huy. The turf field along with a new track surface and additional stadium upgrades took place and were ready for use to begin th fall 2016 sports season. The Bethlehem Area School District Stadium proudly continues its role as one of the premiere high school stadiums in Pennsylvania.
CONCEPT PLAN:
D’Huy Engineering (DEI) has been the Facilities Engineer for the City of Bethlehemformore than 30 years and is responsible for the planning, design and construction of all new, renova- tion and maintenance projects for the District and its 30 build- ings. This work includes the development of concept plans for all athletic complexes including sports fields, stadiums, locker rooms, gymnasiums and pools. Bethlehem Area School Dis- trict Stadium was one of the first synthetic surfaces in the Lehigh Valley. DEI performed the concept study and cost esti- mates for this field and has since completed scoreboard, lock- er room, bleacher, track and press box upgrades. The concept planning, cost estimating and permitting of the Freedom High School soccer field and track venue was also performed by DEI including solar parking canopies for the complex.
COMPLETED PROJECT:
References
Dr. Joseph Roy Bethlehem Area School District Superintendent 610-861-0500 Mark Stein Bethlehem Area School District Chief Facilities & Operations Officer 610-867-8635 Michael Faccinetto Bethlehem Area School District Board President 610-861-0500
0 W E S T U N I O N B O U L E V A R D PROJECT SITE PLAN OPOSED NITSCHMANN MIDDLE SCHOOL 1 0 2 0 3 0 4 0 84,753 sq ft NINTH AVENUE T E N T H A V E . 65 yards 160 feet 24' 8' 301 301 15' SYNTHETIC TURF SCOREBOARD
orth
istrict Stadium
Nitschmann Middle School Stadium
Freedom High School Turf Field
D’Huy Engineering Inc. worked closely with Bethlehem Area School District to establish a master plan, design and budget for the construction of a new lighted multi-sport synthetic turf field and small stadium, as well as a separate synthetic track facility at Freedom High School. D’Huy took the lead on coordinating utility relocations and overseeing construction improvements. This project was completed and ready for the beginning of the Fall 2016 sports season. These facilities have created a new point of focus and pride for Bethlehem Area School District, the Freedom High School campus and the greater Bethlehem area community.
G E N O A S T R E E T D’Huy Engineering completed the concept study and cost estimating and managed the construction of a multi-phased project to replace the existing Nitschmann Middle School and a synthetic multi-sport performance field with spectator seating in 2019. The entire project commenced with a $2M grant obtained by DEI for the District from the Department of Community and Economic Development. DEI’s concept plans were used by the District to retain the design team and perform the design. DEI managed the construction in the field for the project that was completed on time and belowbudget and received a LEED Gold Certification from the United States Green Building Council. existing building outline 12'
295
297
299.50
262 Þxed seats
171'
20' 20'
20'
110 yards
5 0
4 0
3 0
2 0
1 0 0
50'
185'
0 30 90 180
0
1 0
2 0
3 0
4 0
5 0
4 0
3 0
2 0
1 0
0
12'
15'
20'
12'+
E I G H T H A V E N U E
42'
131'
OPTION B
W . S P R U C E S T .
G O E P P S T .
c Copyright 2010 Breslin Ridyard Fadero Architects 589_DD_SITE_PLAN_MKA.pln
Last Updated: 3/3/14
FOR THE NITSCHMANN MIDDLE SCHOOL BETHLEHEMAREA SCHOOL DISTRICT CITY OF BETHLEHEM, LEHIGH COUNTY, PENNSYLVANIA
PROJECT SITE PLAN
B-1
designed checked
date
drawn
comm. no. 581
5/17/13 1/31/ 4
XXX
Project Experience and References - Nazareth Area School Dis
CONCEPT STUDIES COST ESTIMATING DESIGN / CONTRACTOR ENGAGEMENT CONSTRUCTION OVERSIGHT
New Baseball Facility
In 2017 DEI planned and designed a new state-of-the- High School. D’Huy Engineering collaborated with the cept. Once the scope was determined, sketch plans w Designer and presented for consideration. The Dist and the project was approved. Although 2018 present rainfall in the area, the Nazareth Blue Eagles were able with a victory on their new home field.
CONCEPT PLAN:
D’Huy Engineering (DEI) has been the Facilities Engineer for the Nazareth Area School District for more than 20 years and is responsible for the planning, design and con- struction of all new and renovated facilities. In 2007, the District embarked on an athletic improvements plan to upgrade its existing stadium, add an athletic fieldhouse, add a new LEED Gold certified middle school with synthet- ic track and field, add new natural turf performance fields and install a synthetic turf baseball field. The baseball field was the final project completed in 2019.
COMPLETED PROJECT:
References
Dr. Dennis Riker Nazareth Area School District Superintendent 610-759-1170
Raymond Ramella Nazareth Area School District Athletics & Coordinator of Student Activities 610-759-1362
strict
Andrew Leh Stadium
In 2017, DEI provided concept design, cost estimating and construction management services to install a new synthetic turf field inside the School District’s existing Andrew Leh Stadium. DEI provided oversight on all facets of the project including a new ticket booth, bleacher repairs, ornamental fencing and hardscape. The partnership between DEI and the District and Coordinated Health made it possible to replace the existing synthetic turf field for the opening of the stadium prior to the 2017 sports season. DEI also managed the replacement of a grass field with a new synthetic turf field inside the Nazareth Middle School track. This project was completed on time and under budget.
-art Baseball Facility at the District’s e District to develop the project con- were created by our Sports Facility trict selected their preferred design ted many challenges with excessive e to open their 2019 Baseball Season
Project Experience and References - Penn State University
CONCEPT STUDIES COST ESTIMATING DESIGN / CONTRACTOR ENGAGEMENT CONSTRUCTION OVERSIGHT
Penn State Worthington
In 2013 D’Huy Engineering Inc. (DEI) was hired by Pen letic facilities campus at the Penn State, Worthington S local andmain campus officials to develop a plan to bes project resulted in turning a dilapidated baseball field new softball field was carved out of the adjacent ope netting system between fields, new dugouts, and a ce both fields were developed. A field house with conce just off the plaza behind home plate. A third soccer fi and a newwalkway.
CONCEPT PLAN:
D’Huy Engineering was retained by Penn State University for concept planning and ultimately design services for ath- letic improvements at two satellite campuses. Each concept plan was conceived through a collaborative process with multiple layers of university stakeholders. Each plan incor- porated the needs of competitive play, community activities and student recreational use. D’Huy’s attention to detail fo- cuses on total project cost and strategies for project delivery that were outlined in the concept plan provided the univer- sity with the confidence to retain D’Huy for the subsequent design and construction phase services.
COMPLETED PROJECT:
References
Kim Berry Chief Operating Officer PSU Berks 610-396-6030 Penn State Berks Campus:
Kurt Coduti Penn State University Facilities Project Manager 814-863-4960
Eugene Grogan Dir. of Business Services Penn State, Worthington Scranton 570-963-2514 Worthington / Scranton Campus:
Penn State Berks
nn State University to plan an ath- Scranton campus. DEI workedwith st meet the University’s needs. This d into a state-of-the-art diamond. A en field. New fencing, backstops, a entral plaza with bleachers serving essions, toilet rooms and storage is field was renovated with bleachers
D’Huy Engineering, Inc. was retained by Penn State University’s Berks Campus in 2008 to complete a feasibility study for the design of an athletic facilities campus, a study for the campus’s synthetic turf field and athletic complex. DEI’s services helped provide a new lighted synthetic turf field for students to play soccer, rugby and intramural sports. The field is surrounded by a low fence and walking track, and is served by 365 seat bleachers built into an existing bank located off a main walkway through campus. The new facility, besides hosting school events, has become a focal point and gathering place for the campus community.
Project Experience and References
What other Pennsylvania School District clients have to say:
“We value our long term relationship with D’Huy. Their leadership, attention to detail, and team approach has produced an excellent level of quality that has resulted in consistent project success over the past 12 years. For the 2015-2016 school year, the District constructed an $80.7 million middle school and second- ary campus improvements. D’Huy and the District have collaborated throughout the design and construction phases of this project with much success.“
-Joseph Kovalchik Superintendent, Northampton Area School District
“It has been a pleasure to have D’Huy as a part of our construction projects team for our high school and elementary school. They conduct themselves in a pro- fessional and knowledgeable manner. Project timelines and budgets are continu- ously updated which allow us to maintain oversight of completion schedules and dates. We feel exceptionally confident in their abilities to manage our projects.”
-Dr. Nancy Hacker Superintendent, School District of Springfield Township
“Over my years of working with D’Huy Engineering, I can always count on them to be on time, on budget producing remarkable results. Their personnel are ex- perts in managing both design and construction phases, and are always focused on providing the best value. DEI is a reliable and trusted partner of Council Rock School District.“
-Doug Taylor Supervisor of Operational Services, Council Rock School District
MULTI-PURPOSE SYNTHETIC TURF FIELD 138,600 sf NFHS REGULATION BASEBALL - +/-320' left/ 438' center/ 320' right NFHS REGULATION SOFTBALL - +200' left/ 200' center/ 200' right NFHS REGULATION SOCCER FIELD - 110 yds x 70 yds NFHS REGULATION FIELD HOCKEY FIELD - 100 yds x 60 yds NFHS REGULATION UNIFIED LACROSSE FIELD - 110 yds x 60 yds
B&U 015 006 NATURAL LANDS TRUST INC
610.865.3000 (610) 861-0181 FAX www.dhuy.com
“D’Huy Engineering is our “go to” construction manager for our complex pool and central plant project. D’Huy’s employees are resourceful, energetic, and dil- igent and keep everyone accountable. D’Huy’s expertise and experience in all facets of construction make them key members of our team. They are instru- mental to the successful completion of our project.” DAGER ROAD T D'HUY Engineering, Inc. CONSULTING ENGINEERS: One East Broad Street, Bethlehem, PA. 18018 Project Management Facilities Engineering Structural Design & Analysis Forensic Engineering
SCORE BOARD
PARCEL-2 16.1 ac
SPORTSFIELD LIGHTING (TYP.)
-Gerry Moore Director of Buildings and Grounds, Wissahickon School District IMPROVEMENTS STUDY
SK-7 WISSAHICKON SCHOOL DISTRICT DATE: 2-21-19 ATHLETIC FACILITIES
REV:
4-11-19
“D’Huy has always put the needs of our students first. Our High School project had many challenges because we basically built the new building on top of the old building. Not only did DEI minimize the disruption but we also worked with them to provide an opportunity for our students and teachers to use the con- struction as a learning tool. Because of them, our students and community is greatly benefiting from our new High School.”
-Art Levinowitz President of School Board, Upper Dublin School District
“D’Huy was ‘on top’ of the project details and always available to respond to the District’s issues and concerns. Without a doubt, I hold D’Huy in the highest regard.”
-MatthewMalinowski Business Manager, School District of Upper Moreland Township
“D’Huy Engineering understands the importance of relationships and clear communication - even when dealing with complex technical issues. They take the time to make sure that information is accurate and understandable to our many stakeholders.“
-Mark Stein Chief Facilities and Operations Officer, Bethlehem Area School District
Our Team of Professionals:
Project List
Feasibility Study for New Synthetic Turf Field including Baseball, Softball and Multi-Purpose Turf Field Wissahickon School District, Fort Washington, PA Athletic Facilities Master Plan leading into a New Stadium, Synthetic Turf Sports Field, Track, Bleachers, Fieldhouse Pennridge School District Perkasie, PA Athletic Facilities Master Plan leading into a New Synthetic Turf Field and Stadium Improvements Upper Dublin School District Upper Dublin, PA Upper Moreland High School Additions & Renovations Upper Moreland School District Willow Grove, PA Upper Moreland Stadium Renovation and Synthetic Fields Upper Moreland School District Willow Grove, PA Pocono Mountain East High School Stadium Renovations Pocono Mountain West High School Synthetic Field Addition and Stadium Renovation Pocono Mountain School District Swiftwater, PA Hatboro-Horsham HS Turf Field Concept Plan Hatboro-Horsham School District Horsham, PA
Spark Synthetic Turf Fields Upper Dublin Township, Fort Washington, PA Stadium Improvements Northwestern Lehigh School District, New Tripoli, PA Synthetic Turf Sports Field & Track Improvements Easton Area School District Easton, PA Cottingham Stadium Improvements Easton Area School District Easton, PA
Richard Babyack, AIA Athletic Fields Designer
A Registered Architect with more than 35 years of experience in the fields of architecture, surveying and site design. Mr. Babyak has been a project engineer, architect and design team member on numerous synthetic projects in Pennsylvania and New Jersey. He prides himself on his experience in sports field and athletic facility design. He also has extensive experience in computer graphics and model building, and is a High School soccer coach.
Project List
Pennsbury HS Stadium Feasibility Study Pennsbury School District Fallsington, PA East Penn HS Stadium Turf and Track Installation East Penn School District Emmaus, PA New Nitschmann Middle School Value Engineering Study Bethlehem Area School District Bethlehem, PA
James P. Lynch, CCM, AVS Senior Project Manager and Principal Mr. Lynch manages public K-12 projects and holds degrees in both architecture and civil engineering. His familiarity with athletic facili- ties and performing cost estimating will save time and money. He will be your single point of accountability throughout the work and will report directly to the Board and community, keeping you in control of the project.
Project List
Upper Moreland High School Additions & Renovations Upper Moreland School District Willow Grove, PA Upper Moreland Stadium Renovation and Synthetic Fields Upper Moreland School District Willow Grove, PA Hatboro-Horsham High School Turf Field Concept Plan Hatboro-Horsham School District Horsham, PA Pennsbury High School Stadium Feasibility Study Pennsbury School District Fallsington, PA
Stadium Improvements Northwestern Lehigh School District, New Tripoli, PA East Penn HS Stadium Turf and Track Installation East Penn School District Emmaus, PA New Nitschmann Middle School Value Engineering Study Bethlehem Area School District Bethlehem, PA Cottingham Stadium Improvements Easton Area School District Easton, PA
James G. Hanna CCCA, CCS, CPE Cost Estimating Specialists Jim is a Certified Professional Estimator and former President of the Lehigh Valley Chapter of the American Society of Professional Estimators. His track record for hitting budget targets on projects, is second to none. Jim will assess overall project cost, as well as the options considered by the District.
Project List
Whitehall Township Municipal Campus Improvements Whitehall Township Whitehall, PA Upper Dublin Township Public Library Upper Dublin Township Fort Washington, PA New Sandy Run Middle School School District of Upper Dublin Dresher, PA Thomas Mifflin Elementary School Renovations & New Gym School District of Philadelphia Philadelphia, PA Multiple District Capital Projects Pocono Mountain School District Swiftwater, PA
Pennwood Middle School Renovations Pennsbury School District Fallsington, PA Hatboro Horsham School District Capital Projects Horsham, PA Tracy Elementary School Renovations Easton Area School District Easton, PA New Spartan Center Northampton Community College, Bethlehem, PA
Kimberly LaBrake, AIA, NCARB - Building Systems & Code Review Specialist registered architect who works with Jamie and Rick during athletic projects by identifying design issues, project phasing and code constraints. She will assist by providing reviews of the work scopes and in identifying code & permitting hurdles for the project. Mrs. LaBrake is a
Roadmap to Project Success
SYSTEM FOCUS & VALUE ENGINEERING Our staff is adept at facilitating meaningful colla oration between Owner, Architect, and CM ea in the design to select the best systems, ident strategies to reduce the project cost, shorten t schedule, and improve long-term maintenan and energy consumption. 7
BEGINWITH THE END IN MIND Right from the start we focus the team on the educational program and the goals of the stakeholders. Sound Concept Planning and Budgeting is a DEI hallmark.
1
2
MULTI-DISCIPLINE TEAM As construction managers we do more than shuffle paper. We bring a wide array of highly skilled and licensed architects and engineers to every project to provide techni- cal solutions to issues and implements best practices
SCHEDULE-DRIVEN APPROACH Our schedule-driven approach means planning the work then working the plan. During design, DEI documents well-defined milestones for each team member, which establishes clear accountability for the project schedule during design and construction.
3
6
PROCUREMENT From design agreements to the selection of support professionals and ultimately the procurement of bricks andmortar, we strategically protect K-12 owners from
5
risk. 4
BUDGETING EXPERTISE Our estimating team, led by Certified Profe al Estimator, prepares comprehensive bu early in the project, updates this b throughout the design phase, and use budget to “reign in” the architect when n to keep within the available funds.
LEED EXPERIENCE DEI has completed 13 LEED Gold Certified building, obtained $26M in State grants and manages Energy Star Programs for K-12 Districts. We continuously pursue energy savings design.
ab- arly tify the nce
8
CONSTRUCTION PHASING Assembling detailed construction phasing information allows contractors to prepare aggressive bids with fewer contingencies. During construction, these phasing documents progress
BIM CAPABILITIES DEI regularly uses Building InformationModeling (BIM) to deliver projects. Leverag- ing the clash detection capabilities of this software is a cost-effective way to identify and eliminate conflicts before construc- tion even starts.
and confirm that milestone will be met. 10
ONLINE CM SOFTWARE DEI utilize online construction management software, such as Projectmates, on all major projects. We are known for our complete documentation and thorough reporting for K-12 owners...
11
9
12
SAFETY CULTURE Keeping construction sites safe for our staff, contractors, and building inhabitants is crucial. Our experienced resident project representatives communicate regularly with contractors as each implement their project-specific health and safety plans.
CONSTRUCTIBILITY REVIEWS Identifying issues in the design phase is the most effective way to avoid costly change orders during construction. DEI assembles skilled technical teams who utilize a proven methodology for comprehensive reviews tailored to each phase of the design process.
14
13
PRIDE AND ACCOUNTABILITY At DEI we treat every project as if it were our own home. This attention to detail, accountability for actions, and pride of ownership stand out to Owners and contractors and is clearly evident in the finished project.
ession- udgets budget es the needed
PROTECT THE DISTRICT We provide management strategies from start to finish. This includes sound contract language, clear work scopes and relentless effort to resolve issues quickly.
Thank you and we hope to partner with you and your community!