Reading School District

Animated publication

2

2016-2021

3

4

5

6

7

8

9

Owner Criteria ✓ Elementary/Middle School ✓ City Site/Approvals ✓ Multi-Story ✓ Re-purposed site ✓ Subsurface reclamation ✓ Utility Coordination ✓ Limited Construction Staging ✓ Educational & Community Program of Spaces ✓ Community appeal ✓ PENNDOT

10

11

12

13

14

15

16

Students Per Room

Total Students

Students Per Room

Total Students

No.

SF

Total

No.

SF

Total

School Commons Cafeteria (To Serve 350 per serving)

ACADEMIC CENTER Core Programs Kindergarten

1 5,000 5,000 1 3,000 3,000 1 2,000 2,000 1 8,000 8,000 2 1,200 2,400 1 100 100 1 1,000 1,000 1 1,000 1,000

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

Kitchen & Storage

6 1,000 6,000 4 900 3,600 4 900 3,600 4 900 3,600 4 900 3,600 4 900 3,600 4 900 3,600 4 900 3,600 4 900 3,600 9 900 8,100 3 660 1,980 1 660 660 2 660 1,320 2 660 1,320 2 100 200 9 700 6,300 2 1,000 2,000 2 200 400 1 100 100 1 900 900 1 1,200 1,200 2 1,400 2,800 2 1,400 2,800 1 2,000 2,000 1 250 250 1 660 660

20 25 25 25 25 25 25 25 25

120 100 100 100 100 100 100 100 100

Large Group Instruction

First Grade

Gymnasium Locker Rooms

Second Grade Third Grade Fourth Grade

Instructors Office Gymnasium Storage

Fifth Grade Six Grade

Stage

Seventh Grade

Subtotal 16

35,610

0

Eight Grade

Special Educ. Classrooms

0 0 0 0 0 0 0

0 0 0 0 0 0 0

School Administration Building Administration/Guidance

Autistic Support

1 5,000 5,000 1 1,500 1,500 9 500 4,500 1 1,500 1,500

0 0 0 0

0 0 0 0

Occupational Therapy

Health Suite

Speech

Faculty Work Room/Planning

Emotional Support Cool Down Room Small Group Room

Faculty Dining

Subtotal 12

12,500

Subtotal 66

54,680

920

Building Net Square Footage Building Grossing Factor (1.6) Construction Building Area

102,790 164,464 164,464

ADDITIONAL EDUCATIONAL SPACES Art & Music Spaces General Art Classroom

920

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

Art Storage Kiln Room

General Music Classroom Instrumental Music Classroom

Technology Center STEAM Lab STEAM Classroom Library/Media Center Library Work Room

17

T.V. Studio

2022

2023

2024

Reading ES Schedule

J

F M A M J

J

A S O N D

Jan-Aug 2024 Sept '24 Sep '24- Dec '24

City Land Development Process NPDES Permitting Site remediation design Early sitework contract bidding Early sitework construction Building Design Building Bidding and Award Procurement Construction Phase Building Moving & Occupancy Complete sitework and punchlist

18

• • • • • • •

Colonel Jon Siegfried Elementary School

Millmont Elementary School

19

• • •

20

BUS QUEUING Potential Modular ClassroomWings

CONSTRUCTION STAGING AREA

K-5 + Admin + Café/Gym 100,656 SF

6,7,8 & Gym & Aud 63,808 SF

PARKING WITH UNDERGROUND STORMWATER MANAGEMENT

PARENT QUEUING

0266 675((7

21

MEP Engineer

Site Engineer

Architect

Owner

CM

Phasing and Bidding Budget and Schedule

Early site package

Coordinate

Approve

Design

Building Program

Design

Approve

Coordinate Design to suit

Submit and respond to comments

Site design & Land Development Approvals

Coordinate & Participate

Participate & make decisions Coordinate

Schedule

Review & Approve Procure Review & Approve Approve & Purchase

Materials

Design Design

Design

Coordinate Constructability

Modular Options

Coordinate Coordinate Phasing & Cost

Value Engineering Budget and Schedule

Building Systems

Design

Design

Coordinate

Furniture & Equip

Coordinate

22

23

CONSTRUCTION COSTS

SOFT COSTS

Size, sq. ft.:

58,500

Construction Subtotal

$15,975,615.00

Category

$/sq. ft.

Cost

General Req

$9.00

$526,500.00 $713,700.00 $1,725,750.00 $1,193,400.00 $245,700.00 $1,099,800.00 $614,250.00 $1,263,600.00 $292,500.00 $772,200.00 $345,150.00 $1,989,000.00 $1,955,070.00 $1,067,040.00 $71,955.00

Architect Fee

$950,000.00 $640,000.00 $100,000.00 $70,000.00 $47,000.00 $130,000.00 $120,000.00 $170,000.00 $50,000.00 $34,000.00 $140,000.00 $60,000.00 $65,000.00 $110,000.00 $25,000.00

Concrete Masonry

$12.20 $29.50 $20.40 $18.80 $10.50 $21.60 $4.20

CM Fee

Site and Civil Fees Haz Matls Designer

Metals

Wood & Plastics Thermal & Moist

Geotechnical

Phasing

Openings Finishes Specialties Equipment Furnishings Conveying

Phone & Technology Furniture & Equip AHJ Permits & Approvals

$5.00

$13.20

AHJ Inspections

$5.90 $1.23

Abatement

Construction Test Waste Management TAB, LEED Commish Builders Risk Insurance

HVAC

$34.00 $33.42 $18.24

Electrical Plumbing

Construction Subtotal Building Demolition

~

~ ~ ~

Total Soft Costs

~ ~ ~ ~

Total Cost Subtotal Contingency (10%)

Sitework

Inflation Contingency (3%)

24

Total Budget

~

25

26

ESSER FUNDED WORK

CAPITAL FUNDED WORK

SOFT COSTS

191,553 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00

117,757 Division of Work

73,796 Soft Costs

Division of Work General Req'mts

$/SF

$/SF

$ 10.00 $ 13.30 $ 31.50 $ 24.00 $ 5.00 $ 11.75 $ 24.25 $ 6.00 $ 15.60 $ 7.20 $ 1.20 $ 38.00 $ 37.00 $ 18.50

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1,177,570.00 1,566,168.10 3,709,345.50 2,826,168.00 588,785.00 2,590,654.00 1,383,644.75 2,855,607.25 706,542.00 1,837,009.20 847,850.40 141,308.40 4,474,766.00 4,357,009.00 2,178,504.50

General Req'mts

$ 10.00 $ 13.30 $ 31.50 $ 24.00 $ 5.00 $ 11.75 $ 24.25 $ 6.00 $ 15.60 $ 7.20 $ 1.50 $ 38.00 $ 37.00 $ 18.50

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

737,960.00 981,486.80 2,324,574.00 1,771,104.00 368,980.00 1,623,512.00 867,103.00 1,789,553.00 442,776.00 1,151,217.60 531,331.20 110,694.00 2,804,248.00 2,730,452.00 1,365,226.00

Architect Fee

Concrete Masonry

Concrete Masonry

CM Fee

Site and Civil Fees Environmental Fees

Metals

Metals

Wood & Plastics

Wood & Plastics

Geotechnical

Thermal & Moisture $ 22.00

Thermal & Moisture $ 22.00

Phasing

Openings Finishes Specialties Equipment Furnishings Conveying

Openings Finishes Specialties Equipment Furnishings Conveying

Instructional Technology

WAPs, Cameras, IT

Furniture Equipment

City Permits/Approvals

City Inspections

HVAC

HVAC

Construction Testing

Electrical Plumbing

Electrical Plumbing

HVAC Testing & Balancing Builder's Risk Insurance

265.3

265.6

ESSER Subtotal Site Remediation Building sitework

$XX,XXX,XXX.00 Capital Subtotal

$XX,XXX,XXX.00

Soft Cost Subtotal

$

-

K-5 ESSER Building

$XX,XXX,XXX.00 $XX,XXX,XXX.00 $X,XXX,XXX.00 $X,XXX,XXX.00

$X,XXX,XXX.00 $X,XXX,XXX.00

6,7,8 Building

Site Remediation Building Sitework Contingency (10%)

$ $

5,000,000.00 1,500,000.00

Inflation (3%)

27

Grand Total $XX,XXX,XXX.00

• • • • •

28

29

• • •

30

System Type

Geothermal Heat Pump

Conventional VAV

Dual Duct VAV

High Efficiency Air-Cooled Chiller and Condensing Boiler VAV Terminal Unit (shut-off and parallel fan powered)

High Efficiency Air-Cooled Chiller and Condensing Boiler

Central Plant

Geothermal Field

Description

Classroom Terminal Equipment

Individual Heat Pumps

Dual Duct VAV Terminal Unit

Installed Costs ($/sq.ft.) Operating Cost ($/sq.ft./yr) Operating Energy (kBtu/sq.ft./yr)

To be determined based on schematic cost estimates

33.1

44.8

40.9

0.75 Electric

0.81

0.69

Heat Source

Natural Gas

Natural Gas

Estimated Maximum LEED points

19

2

9

Central Equipment Life Expectancy

60

25

25

Terminal Equipment Life Expectancy

15

30

30

Each zone has a separate compressor. No maintenance required for central equipment. Heat pump closets should be created in each classroom. Location of geothermal field needs to be coordinated with stormwater retention and project phasing.

Fan powered VAV terminal units have filters that require servicing.

Maintenance Concerns

Minimal

Two separate air duct systems. Need chases from rooftop equipment to each floor. Dual duct terminal units with duct connections are large.

Need chases from rooftop equipment to each floor.

Architectural Design Impact

Energy Recovery

Yes Yes

Yes No

Yes Yes

Dedicated Outdoor Air System

Humidity Control

Active humidity control

Passive humidity control

Passive humidity control

Considerable impact on emergency power system

Minor impact on emergency power equipment

Minor impact on emergency power equipment

Emergency Generator Backup

31

32

33

34

35

SAMPLE ONLY

No emergency power to UPS in IDF closet

E/M

36

37

38

39

40

41

43

44

45

BUS QUEUING Potential Modular ClassroomWings

CONSTRUCTION STAGING AREA

K-5 + Admin + Café/Gym 100,656 SF

6,7,8 & Gym & Aud 63,808 SF

PARKING WITH UNDERGROUND STORMWATER MANAGEMENT

PARENT QUEUING

0266 675((7

46

47

48

49

50

51

52

53

54

55