Northampton Township New Firestation #3 and New Firestation #73

Station #73

P a g e | 6 Northampton Township Fire Station #73 Project Number: 721001

2022

Overall Project Schedule Status

J ‐ F M ‐ A M ‐ J ‐ J A ‐ S O

Sitework Phasing (See Current Phase and Schedule Status) Building Phasing B73.1 to B73.4 ‐ Place foundations. Complete under slab MEP rough ‐ in. Complete slab on grade and cure time. B73.5 to B73.7 ‐ Erect structural steel. Complete exterior masonry walls. Complete roof (building to be watertight). B73.8 to B73.12 ‐ Complete interior CMU walls, metal studs. Complete in ‐ wall MEP rough ‐ ins. Complete overhead mechanical, plumbing, sprinkler, electric and data rough ‐ ins. B73.13 to B73.16 ‐ Install GWB walls and soffits. Complete painting. Energize permanent power. Install ceiling grid and set ceiling mounted devices. B73.17 to B73.20 ‐ Install casework. Install floor finishes in all areas except apparatus bays. Install vehicle exhaust system. Install floor finish apparatus bays. B73.21 to B73.24 ‐ Complete fire alarm and security system. MEP start ‐ up. Relocated offices from trailers to inside bldg. Complete elevator inspection. B73.25 to B73.28 ‐ Complete all final inspections. Complete final cleaning. Punchlist preparation and Contractor correction period. Owner training of all building systems. B73.29 to B73.31 ‐ Substantial completion, Final completion. Owner furniture, fixtures and equipment move ‐ in and occupy. S73.1 to S73.4 ‐ NTP,process shop dwgs/submittal/begin procurement. Disconnect exist utilities to exist Fire Station. Install temp E&S/construction fence, protect Verizon building. S73.5 to S73.9 ‐ Demo existing fire station incl footings, foundations and existing underground fuel oil tank. Install staging area, construction entrance, construction trailers, temporary, power, site lighting and communication from existing utilities. EC provide temporary overhead connections. Route new utilities for Verizon bldg. Install stormwater basin and connect to street and storm sewer piping to basin. S73.10 to S73.14 ‐ Prepare bldg. Pad, install underground electric and gas to bldg. Pad. Install sanitary piping. Sewer piping connect to street pipe. Complete rough grading, install retaining walls. S73.15 to S73.20 ‐ Remove construction trailers. Inst. ext. light bases, posts, lights. Inst. conc. curbs, stone base, base course paving for const. access. Inst. final paving and line striping. Complete final grading, seeding and landscaping. B73.1 to B73.4 ‐ Place foundations. Complete under slab MEP rough ‐ in. Complete slab on grade and cure time. Issues Resolved Unsuitable soils removed and replaced with engineered fill to complete the building pad. Current Site Phase: Current Building Phase: Current Phase and Schedule Status

F M A M J

Made with FlippingBook Ebook Creator