New Upper Dublin Middle School

School District:  Upper Dublin School District Project Name:  Sandy Run Middle School Project Number:  280010

2019

Overall Project Schedule Status

J/A/S O/N/D J/F/M A

New Building Site Construction Phase S2B S2B.8‐S2B.18: water meter pit/dom.&fire lines, driveway conn.,emer.gen feed/san.pipe/ret walls/backfill soil/grass paver S2B19‐S2B.23: Install walkways, relocate const. trailers, remove temp rock const. entrance, new multi‐purpose and ball fields Building Construction Phase 2B 2B.1 ‐ 2B.2 Stone Classroom Building pad 2B.3 Stone Main Building Pad 2B.4 MEP Underground rough in classroom wing 2B.5 Concrete slab on grade classroom wing 2B.6 ‐ 2B.7 Main building foundations, MEP underground rough in, masonry and structural steel 2B.8 ‐ 2B.10 Classroom ground floor masonry, structural steel and concrete deck 2B.11 ‐ 2B.15 Classroom 1st, 2nd floor and roof masonry, structural steel and concrete deck 2B.16 ‐ 2B.18 Main Building masonry, structural steel and concrete deck 2B.19‐2B31: Exterior shell, masonry, inst. Fireproofing,,MEP above ceiling,int. partitions MEP rough‐in, wall finishes, floor finishes,  ceiling grid,MEP ceiling equip, energy permanent power 2B.32‐2B.38: Equipment start‐up, commissioning, punchlist, substantial completion, district clean‐up and move‐in Western Building and Site Construction Phase 3 (6/15/22 ‐ 8/25/22) S3.1 ‐ S3.14: Sitework, demo of southern portion of existing building, modulars removal an temporary driveway installation Western Building and Site Construction Phase 4 (8/25/22 ‐ 6/15/23) S4.1 ‐ S4.21: Sitework, demo in entirety of existing building, installation of parking lots and driveways Site Construction Phase 5 (6/15/23 ‐ 8/15/23) S5.1‐S5.9: Sitework:  Final grade and seeding, final paving and landscaping installation

2019

Current Phase and Schedule Status

J/A/S O/N/D J/F/M A

Site Construction Phase S2A & S2B Site Construction Phase S2A has been completed S2B.8 ‐ S2B.9 Install new meter pit and domestic water and fire lines.  Remove existing meter pit.   S2B.1‐S2B.7: Classrm wing blg. pad, re‐route sanitary, u/g water service, main wing subgrade, comp u/g utility rough‐in

Issues Resolved 1.  The new water meter pit will be installed during the week of Spring Break to reduce the impact on students and staff (there will be no water to the existing middle school th

Contract General Contractor: Skepton Construction, Inc. Mechanical Contractor: Boro Construction Electrical Contractor: Boro Construction Plumbing Contractor: JBM Mechanical, Inc. Environmental Contractor: Sargent Enterprises, Inc.

Contract Amount

2,000, $                             11,426, $                           59,463, $                          6,280, $                            410, $                                6,748, $                            43,158, $                          2,867, $                           

Total Total Soft Costs: Current Remaining Project Contingency

G:\Projects\006-299 - Schools\280 - Upper Dublin SD\280010 - Sandy Run MS\Payments & Change Orders\Contract Status and Payment Log_280010.xlsx