New Lehigh Elementary School

The elevator car has been installed and the shaft closed in.

Installation of epoxy terrazzo flooring at the main entrance.

The carpet in the library has been installed with the remaining millwork ongoing.

Acoustical sound panels for the STEAM classroom.

February 2021

Made with FlippingBook - Online Brochure Maker