MERCK
Statistics and Services
By the Numbers
$18,377,916 IN STATE GRANTS OBTAINED
CHANGE ORDERS IN PAST 10 YEARS ON TOTAL CONSTRUCTION VALUE OF $850M
EMPLOYEE TIME LOST FROM JOB-SITE INCIDENTS
INVESTIGATE & PLAN
DES From small repairs and maint wide improvements and new a single point of contact for de execution. Our multi-disciplin and cost effective solutions th and ease of maintenance. We municipal and regulatory app costs control and focus on con strategy.
Facility Owners rely on D’Huy to investigate and determine the feasibility of proposed projects. Rope access and destructive/non-destructive investigations provide data for conceptual plans and budgets allowing Owners to perform alternative analysis. Our long range capital plans offer accuracy and a proven means to prioritize and strategize capital work. We often say, “Plan the work and then work the plan.” Our seasoned staff provides the detail that expedites the future design process.
CIVIL • STRUCTURAL • MECHANIC
Capital Improvement Plan PPL Corporation, Pennsylvania
Forensic Investigations
Bruce Haines Managing Partner Hotel Bethlehem 610.625.2201
Mr. David Hopfer, PE Manager, Civil / Structural 610.774.6816
Technical Inspection, Structural Design & Project/Construction Management • The decommissioning and demolition of 600’ of flue gas chimneys - $2M • The permitted closure of 60 acre and 150 acre coal ash basins - $20M • The demolition of an electrostatic precipitator and replacement with gas train ductwork - $9M • The reinforcement of nine 40’ diameter, 60’ tall coal silos and the repair and reinforcement of four 30’ diameter, 60’ tall concrete coal silos - $7M • The design and construction of a coal car rail extension - $7M
Hotel Bethlehem Cornice Failure Investigation and Repair • Investigated collapse of cantilevered terracotta cornice on 9-story Hotel Bethlehem. • Performed field surveys and oversaw probe openings made to assess existing conditions and cause(s) of collapse. • Analyzed extent of corrosion deterioration and designed repairs to stabilize cornice components. • Prepared bid documents and monitored repair work, including installation of stainless steel sock anchors and new GFRC cornice components.
Made with FlippingBook - Online magazine maker