Lower Nazareth Elementary School

Work Completed

• Start: July 15, 2020 • Completion of Phase: April 2, 2021 Phase B1.1-B1.30: Building Phase 1

Work Completed

• Installation of steel bar joists in classroom addition area • Coordination drawings completed • Off site steel fabrication inspection • Steel decking and miscellaneous bridging • Perimeter CMU walls • Topping out exterior perimeter CMU walls • Roof drain procurement • Metal framing at Cafeteria • Steel decking of Administration addition

Metal Stud Framing at Cafeteria