Goodman Building Renovation and Expansion
REPURPOSING & HISTORICAL IMPACT
Although much has been achieved to stabilize the building structure and interior building conditions, there are a number of building core and shell items that have yet to be completed. This next phase of the project will include additional masonry restoration work, removal of delaminating sections of exterior stucco, installation of newwindows, restoration of the three cornice areas, installation of floor framing and decking in areas not completed during the initial phase. Exterior restoration work will be performed to capture the historical character and aesthetics of the original Goodman Furniture building. In addition, a new permanent HVAC systemwill be installed to condition the building and maintain stable temperatures and humidities, which will prevent the return of microbiological growth. New electric, fire alarm and data systems will be installed, as well as new plumbing and fire protection systems. Newwalls and ceilings will be provided, and all floors will be made handicap accessible with a new elevator and stairs.
Remove Delaminated Stucco
Restore Deteriorated Masonry Façade Areas
Restore Deteriorating Cornices
Replacement of Old Damaged Windows
Finish Restructuring Collapsed Floor Areas
COLLABORATION 3, LLC
Made with FlippingBook. PDF to flipbook with ease